MADISON, Wis. – The Camp Randall Stadium Renovation begun in December of 2001 is drawing to its completion in time for the first game with Bowling Green on Sept. 3.
MADISON, Wis. – The Camp Randall Stadium Renovation begun in December of 2001 is drawing to its completion in time for the first game with Bowling Green on Sept. 3.