A university engineering study in 2013 revealed numerous structural problems with the four-decade-old bridge. In some places, concrete had fallen off, exposing steel reinforcing bars. Officials concluded it was time to either replace the bridge, which would cost about $1.5 million, or demolish it, which would cost about $180,000, director of campus Gary Brown said.