The year is 2028, and a state-of-the-art building has opened in the heart of UW-Madison’s College of Engineering campus. It’s six times larger than the Depression-era building it replaced and designed to last a century or more.
The year is 2028, and a state-of-the-art building has opened in the heart of UW-Madison’s College of Engineering campus. It’s six times larger than the Depression-era building it replaced and designed to last a century or more.